1
|
MXPD1601US02701
|
RUBBER BLADDER
|
NW CONSTRUCTION INC
|
YOOIL ENGINEERING CO LTD
|
2016-01-30
|
South Korea
|
4842 Kgs
|
2 PKG
|
2
|
MXPD1601US02202
|
POCKET DAM
|
M2 STRATEGIES, LLC
|
YOOIL ENGINEERING CO LTD
|
2016-01-29
|
South Korea
|
90 Kgs
|
1 PKG
|
3
|
MXPD1508CA00101
|
RUBBER SHEET AIRTIGHTNESS SHEET AND RUBBER BLADDER
|
JIMMIE CREEK LIMITED PARTNERSHIP
|
YOOIL ENGINEERING CO LTD
|
2015-08-15
|
South Korea
|
10000 Kgs
|
2 PKG
|
4
|
HJSCSEL4B5372A01
|
RUBBER SHEET
|
ALTAGAS RENEWABLE POWER INC
|
YOOIL ENGINEERING CO.,LTD
|
2014-09-22
|
South Korea
|
21655 Kgs
|
4 PKG
|
5
|
MXPD1404CA00204
|
PARTS FOR HYDROELECTRIC BLOWER
|
ALTAGAS RENEWABLE POWER INC
|
YOOIL ENGINEERING CO LTD
|
2014-04-23
|
South Korea
|
837 Kgs
|
1 PKG
|
6
|
KLLPKLLA4717
|
NUT & SPRING WASHERS
|
PPL MONTANA LLC
|
YOOIL ENGINEERING CO LTD
|
2013-08-29
|
South Korea
|
408 Kgs
|
1 PKG
|
7
|
MOLUH2000184617
|
1 PKG 1 BOX OF AIR NOZZLES OF RUBBER ACTUAL SHIPPER YOOIL ENGINEERING CO., LTD
|
ALTAGAS RENEWABLE POWER INC
|
YOOIL ENGINEERING CO., LTD
|
2013-04-29
|
South Korea
|
2000 Kgs
|
1 PKG
|
8
|
ZIMUSEL2084927
|
RUBBER SHEET / 32T LIFTING TOOLS FINAL DESTINATION : DODSON DAM DODSON DAM ROAD, MALTA, MT59538, UNITED STATES THE TRANS PORTATION FROM TACOMA TO FINAL DESTINATIO N WILL BE ARRANGED BY CONSIGNEE- RESPONSI BILITY & COST.
|
MALTA IRRIGATION DISTRICT
|
YOOIL ENGINEERING CO., LTD
|
2013-01-26
|
South Korea
|
3841 Kgs
|
2 PKG
|
9
|
HDMUBUWB7140106F
|
2 PKGS OFBLOWER SETH.S. CODE: 8414599000
|
CONSTRUCTION DEMATHFU & BARD INC.
|
YOOIL ENGINEERING CO., LTD.
|
2012-09-24
|
South Korea
|
2612 Kgs
|
2 PKG
|
10
|
MOLUH2000125252
|
1 PKG1 PKG OFBLOWER (VACUUM PUMP FOR WATER GATE)(8414.59.9000)ACTUAL SHIPPER YOOIL ENGINEERING CO.,LT
|
CONSTRUCTION DEMATHIEU & BARD (CDB)
|
YOOIL ENGINEERING CO.,LTD
|
2012-06-04
|
South Korea
|
1306 Kgs
|
1 PKG
|