1
|
RCKI1008YOK01
|
EQUIPMENT AND MATERIALS FOR PVA 1ST LINE PROJECT BAGGING AND PALLETIZING MACHINES AND SMALL BAG PACKAGING UNIT FREIGHT PREPAID AS ARRANGED SHIPPED ON BOARD: MAR30,2014
|
ENGINEERS & CONSTRUCTORS INT INC
|
MITSUI ENGINEERING & SHIPBUILING
|
2014-05-12
|
Japan
|
30800 Kgs
|
15 CAS
|
2
|
RCKI1007UKB05
|
(2 CASES & 4 CRATES) EQUIPMENT AND MATERIALS FOR PVA 1ST LINE PROJECT ROTARY VALVES - 2 HS CODE: 8481.80,7308.40 FREIGHT PREPAID AS ARRANGED SHIPPED ON BOARD: MAR22,2014
|
ENGINEERS & CONSTRUCTORS INT INC
|
MITSUI ENGINEERING & SHIPBUILING
|
2014-05-01
|
Japan
|
29600 Kgs
|
6 CAS
|
3
|
RCKI1003UKB02
|
EQUIPMENT AND MATERIALS FOR PVA1ST LINE PROJECT SCREW COVEYORS HS CODE:8479.82 FREIGHT PREPAID AND AS ARRANGED SHIPPED ON BOARD: JAN22,2014
|
ENGINEERS & CONSTRUCTORS INT INC
|
MITSUI ENGINEERING & SHIPBUILING
|
2014-02-22
|
Japan
|
18150 Kgs
|
18 CAS
|
4
|
RCKI1002SHA26
|
COLUMN REACTOR HEAT EXCHANGER
|
ENGINEERS & CONSTRUCTORS INT INC
|
MITSUI ENGINEERING & SHIPBUILING
|
2014-02-15
|
China
|
533212 Kgs
|
66 UNP
|
5
|
RCKI1001SHA54
|
HEAT EXCHANGERS
|
ENGINEERS & CONSTRUCTORS INT INC
|
MITSUI ENGINEERING & SHIPBUILING
|
2014-01-18
|
China
|
64528 Kgs
|
8 SKD
|
6
|
RCKI1000YOK01
|
EQUIPMENT AND MATERIALS FOR PVA 1ST LINE PROJECT CENTRIFUGE HS CODE: 8421.19-0002 FREIGHT PREPAID AS ARRANGED SHIPPED ON BOARD: NOV30,2013
|
ENGINEERS & CONSTRUCTORS INT INC
|
MITSUI ENGINEERING & SHIPBUILING
|
2014-01-02
|
Japan
|
32290 Kgs
|
6 CAS
|
7
|
RCKI1000USN02
|
EQUIPMENT AND MATERIALS FOR PVA 1ST LINE PROJECT COLUMN-CS, COLUMN-SS-3, SHELL & TUBE HEAT EXCHANGER-CS, SHELL & TUBE HEAT EXCHANGER-SS-1, VESSEL-CS, VESSEL-SS, VESSEL WITH
|
ENGINEERS & CONSTRUCTORS INT INC
|
MITSUI ENGINEERING & SHIPBUILING
|
2014-01-02
|
South Korea
|
391640 Kgs
|
140 UNT
|