1
|
MEDUKD757507
|
ALUMINIUM WIRE - OF ALUMINIUM, NOT ALLOYED - - OF - TOTAL PACKAGES ( DRUMS) CONTRACT NO. EBS- - OVERHEAD LINE T-OFF- SS/O LOT A DATED -JAN- DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INSTALLATION ON EPC BASIS KV ( KM) & KV ( KM) DC OHL ON NARROW BASED TOWERS IN PARAMARIBO AND KV UNDERG, ROUND CABLING WORKS AT O SUBSTATION. / KV X MM STRANDED CU CABLE UNDERGROUND EARTH CABLE, MM COPPER GROSS WT. . KGS NET WT. . KGS =E MAIL: SHIPPING=EBS.SR ==DODDINAGAVEERA.S=KALPATA RUPROJECTS.COM ALPESH.AMIN=KALPATARUPROJE CTS.COM FREIGHT PREPAID
|
ENERGIEBEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-11-03
|
India
|
8821 Kgs
|
3 PKG
|
|
2
|
MEDUKD651569
|
GALVANISED TRANSMISSION LINE TOWERS & PARTS - GALVANISED TRANSMISSION LINE TOWERS & PARTS THERE OF EARTHING MATERIALS
|
ENERGIEBEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-11-03
|
India
|
113223 Kgs
|
196 PKG
|
|
3
|
MAEU257270419
|
MARCHE GPLPD LOT CONSTRUCTION OF SUBSTATIONS TRANSMISSION LINES AND REACTIVE POWER REINFORCEMENTS WITHIN REGION NO. OF THE DEMERARA BERBICE INTERCONNECTED SYSTEM X FLAT STC HYUNDAI R HYDRAULIC EXCAVATOR FITTED WITH RBC COUPLER EEXCHYR (ENGINE NO A MACHIN PIN NO HYNDN CE, ) MACHINE COLOUR YELLOW. HSN CODE NO OF OLD USED ROCK BREAKER HDB WITH CHISEL HSN CODE X FLAT STC HYUNDAI R L HP . T ALONG WITH QUICK COUPLER FOR EXCAVATOR HYUNDAI R L (MACHINE SRNO N D ENGINE NO ) MACHINE COLOUR YELLOW. HSN CODE NO OF OLD USED ROCK BREAKER HDB HSNCODE
|
KALPATARU PROJECTS INTERNATIONAL LI
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-09-12
|
Spain
|
50824 Kgs
|
4 CTN
|
|
4
|
MEDUOO910824
|
DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INS - CONTAINING BUNDLES, BOXES & WOODEN CRATE GALVANISED TRANSMISSION LINE TOWERS & PARTS THEREOF CONTAINING CONTRACT NO. EBS- - OVERHEAD LINE T-OFF- SS/O LOT A DATED -JAN- DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INSTALLATION ON EPC BASIS, KV ( KM) & KV ( KM) DC OHL ON NARROW BASED TOWERS IN PARAMARIBO AND KV UNDERGROUND CABLING WORKS AT O SUBSTATION. EARTHING MATERIALS SHIPPING BILL NO.: , , , , DT. . . HSN CODE: GROSS WEIGHT: . KGS NET WEIGHT: . KGS FREIGHT PREPAID NOTIFY : & PLACE OF FINAL DESTINATION KALPATARU POWER TRANSMISSION LTD, STORES BOROKOPONDO# PARAMARIBO,SURINAME DODDI NAGA VEERA SAIBABU/ ALPESH AMIN DODDINAGAVEERA.S=KALPATARU PROJECTS.COM ALPESH.AMIN=KALPATARUPROJE CTS.COM =E MAIL: SHIPPING=EBS.SR
|
ENERGIEBEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-09-08
|
India
|
23997 Kgs
|
47 PKG
|
|
5
|
MEDUOO887048
|
STRANDED WIRE, CABLES, PLAITED BANDS AND THE LIKE, - ACSR DOVE CONDUCTOR AND ACSR MERLINCONDUCTOR UN GREASEDAS PER PI NO EXP / DT - - AND PO NO. DT. - - FOR USD . FOR ONWARD SUPPLY FOR PROJECT FOR DESIGN,ENGINEERING,MANUFAC TURING, SUPPLY AND INSTALLATION ON EPC BASIS KV( K, M)AND KV( KM) DCOHL ON NARROW TOWERSIN PARAMARIBO AND KV UNDERGROUNG CABLINGWORKS AT O SUBSTATION. HS CODE: .
|
ENERGIEBEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-08-31
|
India
|
73511 Kgs
|
19 PKG
|
|
6
|
MEDUOO698684
|
DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INS - DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INSTALLATION
|
ENERGIEBEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-08-26
|
India
|
47179 Kgs
|
102 PKG
|
|
7
|
MAEU251048364
|
TOTAL 16 PACKAGES CONTRACT NO .: DM-DGDC-384816-CW DATED 03. 09.2024 DOMINICA GEOTHERMAL R ISK MITIGATION PROJECT II (P17 9845) NEW 2.2KV/11KV/33KV/69K V SUBSTATIONS AND NEW 11KV/33K V/69KV OHL AND UGC TRANSMISSI, ON LINES CABLE POWER SB NO. & DT.: 8936504/12.03.2025 89 93857/13.03.2025 FREIGHT PREP AID TOTAL NT. WT.: 192589.0 0 KG TOTAL GR. WT.: 210070.00 KG
|
M/S DOMINICA GEOTHERMAL DEVELOPMENT
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-05-22
|
Morocco
|
210511 Kgs
|
16 DRM
|
|
8
|
MAEU250310217
|
TOTAL 18 PACKAGES ENGINEERING , PROCUREMENT AND CONSTRUCTION (EPC) SERVICES FOR TRANSMIS SION LINES AND SUBSTATIONS F OR GUYANA INTEGRATED NGL PLANT AND 300MWE CCGT POWER PLANT PROJECT CONTRACT NO : OPM/GT, E/RFP/T-S/2022-1 (CHAIN LINK FENCING MATERIAL ANGLE,GI,65 X65X5MM,EN 10025-2:2019 S355 ANGLE,GI,45X45X5MM,EN 10025-2: 2019 S355 FLAT,EARTH,STRIP,MS ,25X3MM BOLT,ANCHOR,GI,12MM BOLT,HEX,GI,12MM,40MM WASHER, FLAT,HDG,12MM NUT,HEX,HDG,12MM LOCK NUT,HDGI,12MM PLATE,B ASE,GI,6X6MM,6MM FENCE,1.8M,3 .2MM,GI WIRE,BARBED,14GAUGE WIRE,BINDING,GI,3.2MM CLIP,BI NDING,GI,5MM CLAMP,WTC,GI,3.2 MM SECTION,SHS,GI,50X50X2MM SECTION,SHS,GI,25X25X2MM PLAT E,BASE,MS,3X3M,5MM PLATE,BASE,MS,3X3M,25MM ROD,MS,16MM RO D,MS,10MM ROD,PLAIN,MS,20MM ROD,MS,35MM ROD,MS,50MM WHL, BASE,MS,150X40MM HINGE,HD,30X 3MM,SS SPIKE,EARTH,MTL,GI,16M M,200MM PANIC BAR,DM,PHA1000, 2LEAF,SS,40-50MM PLATE,BASE,G I,200X200MM,10MM) SHIPPING BILL NO. 8592356 DT. 28/02/2025 NET WEIGHT: 23310.90 -EMAIL: UDAY.KUMAR@KALPATARUPROJECTS .COM FREIGHT PREPAID
|
KALPATARU PROJECTS INTERNATIONAL LI
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-05-22
|
Spain
|
26513 Kgs
|
18 PKG
|
|
9
|
MAEU251220834
|
29 TOTAL PACKAGES (28 BUNDLES + 1 BOXES) ENGINEERING, PRO CUREMENT AND CONSTRUCTION (EPC ) SERVICES FOR TRANSMISSION L INES AND SUBSTATIONS FOR GUYA NA INTEGRATED NGL PLANT AND 3 00MWE CCGT POWER PLANT PROJECT, CONTRACT NO : OPM/GTE/RFP/T- S/2022-1 GALVANISED TRANSMISS ION LINE TOWERS AND PARTS THE REOF HSN CODE : 73082011 S B NO. & DT. 8935774/12.03.202 5 8935775/12.03.2025 FREIG HT PREPAID GROSS WT. 8.1089 6 MT NET WT. 8.04096 MT GROSS WT. 8108.96 KGS NET WT. 8 040.96 KGS -MOBILE: +91-995 630 6363 +592-725 4409 EMAIL: UDAY.KUMAR@KALPATARUPROJECTS .COM
|
GOVERNMENT OF THE CO-OPERATIVE REPU
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-05-03
|
Morocco
|
8126 Kgs
|
29 PKG
|
|
10
|
MAEU251307183
|
01X40 FCL CONTAINER TOTAL 120 PACKAGES CONTRACT NO. : DM-D GDC-384816-CW DATED 03.09.2024 DOMINICA GEOTHERMAL RISK MIT IGATION PROJECT II (P179845) NEW 2.2KV/11KV/33KV/69KV SUBS TATIONS AND NEW 11KV/33KV/69K, V OHL AND UGC TRANSMISSION LI NES RAIL FOR TRANSFORMER , RO PE,12STRAND,PLATEENA NEO,FIBE R,10MM ROPE,NYL,3STRAND,WHT,F IBER,8MM , HDPE DUCT PIPE,AA, 50-200MM,JNT MACHINE CONDUCTO R,SOFT,TINNED CU,95MM2. , CON DUCTOR,SOFT,TINNED CU,70MM2. SPACER,PIPE,HDPE ABS,140MM + 50MM,69KV SPACER,PIPE,HDPE AB S,200MM + 50MM,33KV SPACER,PI PE,HDPE ABS,140MM + 50MM,11KV HSN CODE: 56075090 , 56075040 , 84772000 , 74081190 , 39174 000 , 73021019 SB NO. 876970 3 DT. 06-MAR-25 SB NO. 8811539 DT. 07-MAR-25 SB NO. 887028 4 DT. 10-MAR-25 SB NO. 867352 6 DT. 03-MAR-25 SB NO. 860431 0 DT. 28-FEB-25 TOTAL NET WEI GHT - 11151.48 KG TOTAL GROSS WEIGHT- 11524.58 KG FREIGHT PREPAID
|
M/S DOMINICA GEOTHERMAL DEVELOPMENT
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-05-03
|
Morocco
|
11549 Kgs
|
120 PKG
|