MARCHE GPLPD LOT CONSTRUCTION OF SUBSTATIONS TRANSMISSION LINES AND REACTIVE POWER REINFORCEMENTS WITHIN REGION NO. OF THE DEMERARA BERBICE INTERCONNECTED SYSTEM X FLAT STC HYUNDAI R HYDRAULIC EXCAVATOR FITTED WITH RBC COUPLER EEXCHYR (ENGINE NO A MACHIN PIN NO HYNDN CE, ) MACHINE COLOUR YELLOW. HSN CODE NO OF OLD USED ROCK BREAKER HDB WITH CHISEL HSN CODE X FLAT STC HYUNDAI R L HP . T ALONG WITH QUICK COUPLER FOR EXCAVATOR HYUNDAI R L (MACHINE SRNO N D ENGINE NO ) MACHINE COLOUR YELLOW. HSN CODE NO OF OLD USED ROCK BREAKER HDB HSNCODE
|
KALPATARU PROJECTS INTERNATIONAL LI
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-09-12
|
Spain
|
50824 Kgs
|
4 CTN
|
2
|
MEDUOO910824
|
DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INS - CONTAINING BUNDLES, BOXES & WOODEN CRATE GALVANISED TRANSMISSION LINE TOWERS & PARTS THEREOF CONTAINING CONTRACT NO. EBS- - OVERHEAD LINE T-OFF- SS/O LOT A DATED -JAN- DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INSTALLATION ON EPC BASIS, KV ( KM) & KV ( KM) DC OHL ON NARROW BASED TOWERS IN PARAMARIBO AND KV UNDERGROUND CABLING WORKS AT O SUBSTATION. EARTHING MATERIALS SHIPPING BILL NO.: , , , , DT. . . HSN CODE: GROSS WEIGHT: . KGS NET WEIGHT: . KGS FREIGHT PREPAID NOTIFY : & PLACE OF FINAL DESTINATION KALPATARU POWER TRANSMISSION LTD, STORES BOROKOPONDO# PARAMARIBO,SURINAME DODDI NAGA VEERA SAIBABU/ ALPESH AMIN DODDINAGAVEERA.S=KALPATARU PROJECTS.COM ALPESH.AMIN=KALPATARUPROJE CTS.COM =E MAIL: SHIPPING=EBS.SR
|
ENERGIEBEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-09-08
|
India
|
23997 Kgs
|
47 PKG
|
3
|
MEDUOO887048
|
STRANDED WIRE, CABLES, PLAITED BANDS AND THE LIKE, - ACSR DOVE CONDUCTOR AND ACSR MERLINCONDUCTOR UN GREASEDAS PER PI NO EXP / DT - - AND PO NO. DT. - - FOR USD . FOR ONWARD SUPPLY FOR PROJECT FOR DESIGN,ENGINEERING,MANUFAC TURING, SUPPLY AND INSTALLATION ON EPC BASIS KV( K, M)AND KV( KM) DCOHL ON NARROW TOWERSIN PARAMARIBO AND KV UNDERGROUNG CABLINGWORKS AT O SUBSTATION. HS CODE: .
|
ENERGIEBEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-08-31
|
India
|
73511 Kgs
|
19 PKG
|
4
|
MEDUOO698684
|
DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INS - DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INSTALLATION
|
ENERGIEBEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-08-26
|
India
|
47179 Kgs
|
102 PKG
|
5
|
MAEU251048364
|
TOTAL 16 PACKAGES CONTRACT NO .: DM-DGDC-384816-CW DATED 03. 09.2024 DOMINICA GEOTHERMAL R ISK MITIGATION PROJECT II (P17 9845) NEW 2.2KV/11KV/33KV/69K V SUBSTATIONS AND NEW 11KV/33K V/69KV OHL AND UGC TRANSMISSI, ON LINES CABLE POWER SB NO. & DT.: 8936504/12.03.2025 89 93857/13.03.2025 FREIGHT PREP AID TOTAL NT. WT.: 192589.0 0 KG TOTAL GR. WT.: 210070.00 KG
|
M/S DOMINICA GEOTHERMAL DEVELOPMENT
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-05-22
|
Morocco
|
210511 Kgs
|
16 DRM
|
6
|
MAEU250310217
|
TOTAL 18 PACKAGES ENGINEERING , PROCUREMENT AND CONSTRUCTION (EPC) SERVICES FOR TRANSMIS SION LINES AND SUBSTATIONS F OR GUYANA INTEGRATED NGL PLANT AND 300MWE CCGT POWER PLANT PROJECT CONTRACT NO : OPM/GT, E/RFP/T-S/2022-1 (CHAIN LINK FENCING MATERIAL ANGLE,GI,65 X65X5MM,EN 10025-2:2019 S355 ANGLE,GI,45X45X5MM,EN 10025-2: 2019 S355 FLAT,EARTH,STRIP,MS ,25X3MM BOLT,ANCHOR,GI,12MM BOLT,HEX,GI,12MM,40MM WASHER, FLAT,HDG,12MM NUT,HEX,HDG,12MM LOCK NUT,HDGI,12MM PLATE,B ASE,GI,6X6MM,6MM FENCE,1.8M,3 .2MM,GI WIRE,BARBED,14GAUGE WIRE,BINDING,GI,3.2MM CLIP,BI NDING,GI,5MM CLAMP,WTC,GI,3.2 MM SECTION,SHS,GI,50X50X2MM SECTION,SHS,GI,25X25X2MM PLAT E,BASE,MS,3X3M,5MM PLATE,BASE,MS,3X3M,25MM ROD,MS,16MM RO D,MS,10MM ROD,PLAIN,MS,20MM ROD,MS,35MM ROD,MS,50MM WHL, BASE,MS,150X40MM HINGE,HD,30X 3MM,SS SPIKE,EARTH,MTL,GI,16M M,200MM PANIC BAR,DM,PHA1000, 2LEAF,SS,40-50MM PLATE,BASE,G I,200X200MM,10MM) SHIPPING BILL NO. 8592356 DT. 28/02/2025 NET WEIGHT: 23310.90 -EMAIL: UDAY.KUMAR@KALPATARUPROJECTS .COM FREIGHT PREPAID
|
KALPATARU PROJECTS INTERNATIONAL LI
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-05-22
|
Spain
|
26513 Kgs
|
18 PKG
|
7
|
MAEU251220834
|
29 TOTAL PACKAGES (28 BUNDLES + 1 BOXES) ENGINEERING, PRO CUREMENT AND CONSTRUCTION (EPC ) SERVICES FOR TRANSMISSION L INES AND SUBSTATIONS FOR GUYA NA INTEGRATED NGL PLANT AND 3 00MWE CCGT POWER PLANT PROJECT, CONTRACT NO : OPM/GTE/RFP/T- S/2022-1 GALVANISED TRANSMISS ION LINE TOWERS AND PARTS THE REOF HSN CODE : 73082011 S B NO. & DT. 8935774/12.03.202 5 8935775/12.03.2025 FREIG HT PREPAID GROSS WT. 8.1089 6 MT NET WT. 8.04096 MT GROSS WT. 8108.96 KGS NET WT. 8 040.96 KGS -MOBILE: +91-995 630 6363 +592-725 4409 EMAIL: UDAY.KUMAR@KALPATARUPROJECTS .COM
|
GOVERNMENT OF THE CO-OPERATIVE REPU
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-05-03
|
Morocco
|
8126 Kgs
|
29 PKG
|
8
|
MAEU251307183
|
01X40 FCL CONTAINER TOTAL 120 PACKAGES CONTRACT NO. : DM-D GDC-384816-CW DATED 03.09.2024 DOMINICA GEOTHERMAL RISK MIT IGATION PROJECT II (P179845) NEW 2.2KV/11KV/33KV/69KV SUBS TATIONS AND NEW 11KV/33KV/69K, V OHL AND UGC TRANSMISSION LI NES RAIL FOR TRANSFORMER , RO PE,12STRAND,PLATEENA NEO,FIBE R,10MM ROPE,NYL,3STRAND,WHT,F IBER,8MM , HDPE DUCT PIPE,AA, 50-200MM,JNT MACHINE CONDUCTO R,SOFT,TINNED CU,95MM2. , CON DUCTOR,SOFT,TINNED CU,70MM2. SPACER,PIPE,HDPE ABS,140MM + 50MM,69KV SPACER,PIPE,HDPE AB S,200MM + 50MM,33KV SPACER,PI PE,HDPE ABS,140MM + 50MM,11KV HSN CODE: 56075090 , 56075040 , 84772000 , 74081190 , 39174 000 , 73021019 SB NO. 876970 3 DT. 06-MAR-25 SB NO. 8811539 DT. 07-MAR-25 SB NO. 887028 4 DT. 10-MAR-25 SB NO. 867352 6 DT. 03-MAR-25 SB NO. 860431 0 DT. 28-FEB-25 TOTAL NET WEI GHT - 11151.48 KG TOTAL GROSS WEIGHT- 11524.58 KG FREIGHT PREPAID
|
M/S DOMINICA GEOTHERMAL DEVELOPMENT
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-05-03
|
Morocco
|
11549 Kgs
|
120 PKG
|
9
|
MAEU250407543
|
TOTAL 69 (SIXTY-NINE) PACKAGE S ONLY OF ENGINEERING, PROCUR EMENT AND CONSTRUCTION (EPC) SERVICES FOR TRANSMISSION LIN ES AND SUBSTATIONS FOR GUYAN A INTEGRATED NGL PLANT AND 30 0MWE CCGT POWER PLANT PROJECT, CONTRACT NO : OPM/GTE/RFP/T- S/2022-1 ACDB & DCDB, LIGTIN G FIXTURES (PANEL,LV,GVW,ACDB ,480V,400A,12OUT. PANEL,LV,GV W,PBD1&2,480V,125A,26OUT. PAN EL,LV,GVW,DCDB,110V,152A,21OUT . BMK,WO463-KPIL-GVW-ELE_0009 . PANEL,LV,WI,DCDB,125V,125A,13OUT. PANEL,LV,WRS,DCDB,125V ,125A,14OUT. FIXTURE,LED,5VA GR,46W,120V,1LED,WHT FIXTURE, LED,RM,40W,120V,1LED,WHT FIXT URE,LED,RM,25W,120V,1LED,WHT FIXTURE,LED,STRUCT MTNG,140W,1 20V,1LED,W FIXTURE,LED,POLE M TND,90W,120V,1LED,WHT FIXTURE,LED,B/H LUM,10W,125V,1LED,WHT MTG,ACCESS,FIXTURE,0.2T,GI,5 0X60X50MM FIXTURE,LED,300W,12 0V,1,WHT) HSN CODE : 85371000 , 94054200 SB NO: 8539460 DAT E: 27/02/2025 SB NO: 8403718 DATE: 22/02/2025 NET WT: 1607 9.10 KGS GR WT: 23306.50 KGS --NOTIFY PARTY CONTACT PER SON: V R UDAY KUMAR MOBILE: + 91-99563 06363 & +592-725 4409 EMAIL: UDAY.KUMAR@KALPATARU PROJECTS.COM
|
GOVERNMENT OF THE CO-OPERATIVE REPU
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-05-03
|
Spain
|
23355 Kgs
|
69 PKG
|
10
|
MAEU250776922
|
TOTAL NO OF PACKAGE: 17 C ONSTRUCTION OF 3.9KM OF DOUBLE CIRCUIT 69KV TRANSMISSION LIN E TO INTERCONNECT A NEW POWE R SHIP TO THE DEMERARA - BARBI CE INTERCONNECTED SYSTEM (DBIS ) CONTRACT NO : 300/2024/02 B, DTD 02ND DEC 2024 FOREIGN P URCHASE ORDER NO 55752 DATED 0 7TH NOV 24 HARDWARE FITTING A ND ACCESSORIES HS CODE: 7308 2011 AND 76169990 TOTAL NET W EIGHT: 8496.00 KG TOTAL GROSS WEIGHT: 9766.00 KG SHIPPING BILL NUMBER : 8920731 DATE: 11-MAR-25 FREIGHT PREPAID - M OBILE: +91 91000 45221 AND +59 2 646 8987
|
GUYANA POWER AND LIGHT INC
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-04-26
|
Spain
|
9786 Kgs
|
17 PKG
|