1
|
MEDUOO910824
|
DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INS - CONTAINING BUNDLES, BOXES & WOODEN CRATE GALVANISED TRANSMISSION LINE TOWERS & PARTS THEREOF CONTAINING CONTRACT NO. EBS- - OVERHEAD LINE T-OFF- SS/O LOT A DATED -JAN- DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INSTALLATION ON EPC BASIS, KV ( KM) & KV ( KM) DC OHL ON NARROW BASED TOWERS IN PARAMARIBO AND KV UNDERGROUND CABLING WORKS AT O SUBSTATION. EARTHING MATERIALS SHIPPING BILL NO.: , , , , DT. . . HSN CODE: GROSS WEIGHT: . KGS NET WEIGHT: . KGS FREIGHT PREPAID NOTIFY : & PLACE OF FINAL DESTINATION KALPATARU POWER TRANSMISSION LTD, STORES BOROKOPONDO# PARAMARIBO,SURINAME DODDI NAGA VEERA SAIBABU/ ALPESH AMIN DODDINAGAVEERA.S=KALPATARU PROJECTS.COM ALPESH.AMIN=KALPATARUPROJE CTS.COM =E MAIL: SHIPPING=EBS.SR
|
ENERGIE BEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-09-08
|
India
|
23997 Kgs
|
47 PKG
|
2
|
MEDUOO887048
|
STRANDED WIRE, CABLES, PLAITED BANDS AND THE LIKE, - ACSR DOVE CONDUCTOR AND ACSR MERLINCONDUCTOR UN GREASEDAS PER PI NO EXP / DT - - AND PO NO. DT. - - FOR USD . FOR ONWARD SUPPLY FOR PROJECT FOR DESIGN,ENGINEERING,MANUFAC TURING, SUPPLY AND INSTALLATION ON EPC BASIS KV( K, M)AND KV( KM) DCOHL ON NARROW TOWERSIN PARAMARIBO AND KV UNDERGROUNG CABLINGWORKS AT O SUBSTATION. HS CODE: .
|
ENERGIE BEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-08-31
|
India
|
73511 Kgs
|
19 PKG
|
3
|
MEDUOO698684
|
DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INS - DESIGN, ENGINEERING, MANUFACTURING, SUPPLY AND INSTALLATION
|
ENERGIE BEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-08-26
|
India
|
47179 Kgs
|
102 PKG
|
4
|
MEDUVW847747
|
GALVANISED TRANSMISSION LINE TOWERS & PARTS THERE - GALVANISED TRANSMISSION LINE TOWERS & PARTS THERE OF
|
ENERGIE BEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-02-15
|
India
|
79200 Kgs
|
148 PKG
|
5
|
MEDUVW860039
|
ELECTRICITY SYSTEM - TOTAL 13 DRUMS CONTAINING DESCRIPTION OF GOODS ELECTRICITY SYSTEM UPGRADE AND EXPANSION PROJECT, CONTRACT CDB - 930 -012, POWER PROJECT SURINAME - LOT 1 SUB STATIONS IN PARAMARIBO & NICKERIE CONTROL CABLE NET WEIGHT: 8393.49 KGS GR WEIGHT: 9408.49 KGS FREIGHT PREPAID
|
ENERGIE BEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2025-02-15
|
India
|
9408 Kgs
|
13 DRM
|
6
|
MEDUHN714264
|
GALVANISED TRANSMISSION LINE TOWERS & PARTS - TOTAL 51 PACKAGES 39BUNDLES 12BOXES CONTRACT NO. CDB -930-012 DATED 10.06.2022 POWER PROJECT SURINAME -LOT 2 (OVERHEAD LINES) GALVANISED TRANSMISSION LINE TOWERS & PARTS THERE OF SB NO :4463733 DATE : 30-SEP-24 SB NO 4463742 DATE : 30/09/2024 SB NO 4463727 DATE : 3, 0/09/2024 GROSS WT:25987.30 KGS NET WT:25233.30 KGS FREIGHT PREPAID
|
ENERGIE BEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2024-12-02
|
Bahamas
|
25987 Kgs
|
51 PKG
|
7
|
MEDUE7073863
|
HF REC BATTERY CHARGER BATTERY FUSE BOX - 1 X 40' HQ CONTAINER CONTA INING ELECTRICITY SYSTEM UPGRADE AND EXPANSION PRO JECT, CONTRACT CDB - 930 - 012, POWER PROJECT SURINA ME - LOT 1 SUB STATIONS IN PARAMARIBO & NICKERIE HF REC BATTERY CHARGER BATTERY FUSE BOX HSN CODE : 8504 4030 , 8537 10 00 S/BILL # 68401, 06 DTD : 18.01.2024 NET WT : 6580 .00 KGS FREIGHT PREPAID == VENUBABU BODALA EMAIL: V INAY.JAISWAL=KALPATARUPOWE R.COM / VENUBABU.BODALA=K ALPATARUPOWER.COM
|
ENERGIE BEDRIJVEN SURINAME
|
KALPATARU PROJECTS INTERNATIONAL LI
|
2024-03-19
|
Sri Lanka
|
8320 Kgs
|
32 PKG
|
8
|
MEDUND458463
|
CABLES - CABLES PAS-W 70, 20 KV
|
ENERGIE BEDRIJVEN SURINAME
|
PRYSMIAN NETHERLANDS B.V.,CFS STORE
|
2020-04-16
|
Belgium
|
20956 Kgs
|
35 PKG
|
9
|
MEDUND454132
|
CABLES - CABLES PAS-W 70, 20 KV
|
ENERGIE BEDRIJVEN SURINAME
|
PRYSMIAN NETHERLANDS B.V.,CFS STORE
|
2020-04-01
|
Belgium
|
23424 Kgs
|
36 PKG
|
10
|
TSQDMI083199
|
TOOLS
|
ENERGIEBEDRIJVEN SURINAME
|
N/A
|
2016-10-14
|
Italy
|
220 Kgs
|
26 PCS
|