1
|
EGLV540720095850
|
FALSE FLOOR 19 PARCELS (PKGS NO. DENCO 001 TO DENCO 018, AND 153 AS PER INVOICE NO BAY 048) TOTAL = 19 PARCEL OF FALSE FLOOR, PROJECTION SUPPORT WITH CLOSER AND
|
CEMENTO BAYANO SA
|
FCB.CIMENT
|
2007-10-08
|
Belgium
|
14351 Kgs
|
19 PCL
|
2
|
APLU701803791
|
40- DRY SOC CARU207594/3 S117023 STC 9 PIECES (PIECES NO 121, 127, 128, 134, 135, 138, ANC003 TO ANC005) CEMENTERY INDUSTRIAL EQUIPMENT TOTAL = 9 CRATES OF HOROMILL ACCESORIES, BOLTS, SUPPORT AND BEAM OF SCRAPPER, DRIVE PULLEY, BEARING AND REDUCER OF BELT CONVEYOR, INSULATING MATERIAL, COVER. ; ; FROM EUROPEAN PORT OF ANTWERP TO DDU CEMENT PLANT OF BAYANO - VIA COLON FZ PORT PANAMA SUPPLY OF GRINDING PLANT WITH HOROMIL @ 3800 AS PER CONTRACT DATED JULY 20,2006 AND NOV.3,2006 ; FREIGHT PREPAID
|
CEMENTO BAYANO SA
|
FCB.CIMENT
|
2007-09-11
|
Netherlands
|
7573 Kgs
|
9 PCS
|
3
|
APLU701803740
|
40- HC APHU635264/3 S/117024 STC 5 PIECES (PIECES NO 122, 126, 147, ANC001 AND ANC002) 40- HC APLU904664/5 S/117025 STC 10 PIECES (PIECES NO 123, 124, 133, 137, STEEL001 TO STEEL006) CEMENTERY INDUSTRIAL EQUIPMENT TOTAL = 24 CRATES OF HOROMILL ACCESORIES, LUBRICATING AND PRESSURE UNIT, MONORAIL ELECTRICAL HOIST, BOLTS, SUPPORT AND BEAM OF SCRAPPER, DRIVE PULLEY, BEARING AND REDUCER OF BELT CONVEYOR, INSULATING MATERIAL, COUPLING S190 BE E2700, COVER. ; FROM EUROPEAN PORT OF ANTWERP TO DDU CEMENT PLANT OF BAYANO - VIA COLON FZ PORT PANAMA SUPPLY OF GRINDING PLANT WITH HOROMIL @ 3800 AS PER CONTRACT DATED JULY 20,2006 AND NOV.3,2006 ; FREIGHT PREPAID
|
CEMENTO BAYANO SA
|
FCB.CIMENT
|
2007-09-04
|
Netherlands
|
34627 Kgs
|
15 PCS
|
4
|
SQSTLIL0024457
|
ROTOR/CENTERING RING/SHAFT WITH PIPE BETWEEN ROTOR/CENTERING RING/SHAFT WITH PIPE BETWEEN BEARINGS ASSEMBLY
|
CEMEX CEMENT OF TEXAS, LP
|
FCB CIMENT
|
2007-08-30
|
Belgium
|
2430 Kgs
|
2 CS
|
5
|
EGLV540720054266
|
CEMENTERY INDUSTRIAL EQUIPMENT
|
CEMENTO BAYANO SA
|
FCB.CIMENT
|
2007-08-20
|
Belgium
|
38733 Kgs
|
33 PCS
|
6
|
APLU701802103
|
CEMENTERY INDUSTRIAL EQUIPMENT PACKAGES NO 095 TO 099, 101 AND 109 ; TOTAL = 7 PCS OF AIR FAN, SET OF REFRACTORIES BRICKS FOR HOT GAS GENERATOR, SAMPING CHUTE AND ELECTRICAL CANINET, SET OF EXPANSION JOINT, SET OF DOORS LEAVES WITH FRAME AND FITTING. ; FROM EUROPEAN PORT OF ANTWERP TO DDU CEMENT PLA
|
CEMENTO BAYANO SA
|
FCB.CIMENT
|
2007-07-17
|
Netherlands
|
13743 Kgs
|
7 PCS
|
7
|
APLU701801309
|
TWO CONTAINERS 40- DRY: TOLU2732717 / S116322 STC 3 PIECES (PKG #043,045,051) LCRU3218072 / S116323 STC 4 PIECES (PKG #042,044,048,049) ONE CONTAINER 40-DRY SOC: GLDU403430/8 / S116437 STC 5 PIECES (PKG #046,047,050,052,053) ; TOTAL = 12 PCS OF HOROMIL SWIVEL AND ACCESSORIES, HOROMIL LININGS, HOROMIL FEEDING PLATE. BEARING, SCREW CONVEYOR, MAGNETIC SEPARATOR, METAL DETECTOR, NERVESCO STEEL STRUCTURE SET, ROTORIC STARTER, FAN FRAME. ; FROM EUROPEAN PORT OF ANTWERP TO DDU CEMENT PLANT OF BAYANO - VIA COLON FREE ZONE PORT - PANAMA SUPPLY OF GRINDING PLANT WITH HOROMIL @ 3800 AS PER CONTRACT DATED JULY 20,2006 AND NOV.3,2006 ; FREIGHT PREPAID
|
CEMENTO BAYANO SA
|
FCB.CIMENT
|
2007-06-18
|
Netherlands
|
37747 Kgs
|
12 PCS
|
8
|
APLU701774847
|
TOLU1617004 / S114871 SAID TO CONTAINS 4 PIECES (PKG # 030,032,033,035) GESU4644829 / S114873 SAID TO CONTAINS (PKG # 023,034,036 TO 041) ; TOTAL=12 PCS OF BUCKET ELEVATOR, DAMPERS, HOROMIL, SHOES BEARING, SMALL SHOES BLOCK AND ACCESSORIES, DIVERTING GATE. ; FROM EUROPEAN PORT OF ANTWERP TO DDU CEMENT PLANT OF BAYANO - VIA COLON FREE ZONE PORT - PANAMA SUPPLY OF GRINDING PLANT WITH HOROMIL @ 3800 AS PER CONTRACT DATED JULY 20,2006 AND NOV.3,2006 ; FREIGHT PREPAID
|
CEMENTO BAYANO SA
|
FCB.CIMENT
|
2007-05-15
|
Netherlands
|
22934 Kgs
|
12 PCS
|
9
|
WLWHBE595393
|
PROCUMENT ERECTION COMMISSIONING FOR A NEW CEMENT MILL PLANT TOTAL = 5 PCS OF BUCKET EL EVATOR HEAD PLATFORM DAMPER PROCESS FAN PROCUMENT ERECTION COMMISSIONING FOR A NEW CEMENT MILL PLANT TOTAL = 5 PCS OF BUCKET EL EVATOR HEAD PLATFORM DAMPER PROCESS FAN PROCUMENT ERECTION COMMISSIONING FOR A NEW CEMENT MILL PLANT TOTAL = 5 PCS OF BUCKET EL EVATOR HEAD PLATFORM DAMPER PROCESS FAN PROCUMENT ERECTION COMMISSIONING FOR A NEW CEMENT MILL PLANT TOTAL = 5 PCS OF BUCKET EL EVATOR HEAD PLATFORM DAMPER PROCESS FAN PROCUMENT ERECTION COMMISSIONING FOR A NEW CEMENT MILL PLANT TOTAL = 5 PCS OF BUCKET EL EVATOR HEAD PLATFORM DAMPER PROCESS FAN
|
CEMENTO BAYANO SA
|
FCB.CIMENT
|
2007-05-03
|
Belgium
|
12353 Kgs
|
5 UNT
|
10
|
MSCULV514124
|
PARTS FOR THE MACHINERY O - SUPPLY OF MECHAN ICAL EQUIP MENT FOR OIL LUBRICATION O F BEARI NG OUTLET SIDE (WIT HOUT ROLLER BEARING) FRE I GHT PAYABLE AT LE HAVRE ON BOARD
|
PANALPINA TRANSPORTES MUNDIALES SA
|
FCB CIMENT
|
2007-03-11
|
Belgium
|
11860 Kgs
|
5 CRT
|