1
|
AUSW1TAC47663A
|
MANUFACTURING SHOP DRAWING FABRICATION OF DEADEAERATOR TO BE INSTALLED IN AMERICAN DOME VESSEL SHELL INSTALLATION PARTS AND SPARE PARTS LADDER PLATFORM DOME INTERNALS
|
1)AIR PRODUCTS AND CHEMICALS INC.
|
SHANGHAI BOILER WORKS CO LTD
|
2022-04-06
|
China Taiwan
|
35309 Kgs
|
13 PKG
|
2
|
CPJQPA40SHAKIN03
|
52 PKG STC DRUM, DRUM HANGER STEEL STRUCTURE BOLT TRAINING MATERIAL GAS DUCT ... 758.53 CBM
|
JISCO ALPART JAMAICA NAIN
|
SHANGHAI BOILER WORKS CO, LTD
|
2019-02-23
|
China
|
248687 Kgs
|
52 PKG
|
3
|
CPJQAN01SHAANR04
|
37 PKGS OF BOILER PRESSURE PARTS
|
HITACHI POWER EUROPE GMBH
|
SHANGHAI BOILER WORKS LTD.
|
2010-01-27
|
China
|
701045 Kgs
|
37 PKG
|
4
|
CPJQSN33SHAANR02
|
87 PKGS OF BOILER PRESSUREPARTS
|
HITACHI POWER EUROPE GMBH
|
SHANGHAI BOILER WORKS LTD
|
2009-12-29
|
China
|
1580037 Kgs
|
87 PKG
|
5
|
CPJQMN27SHAANR02
|
38 PKGS STB BOILER PRESSURE PARTS FOR KWDATTELN PROJECT B114089
|
TO ORDER
|
SHANGHAI BOILER WORKS LTD.
|
2009-02-24
|
China
|
690120 Kgs
|
38 PKG
|
6
|
RCKI224SHAHOU12
|
BOILER PARTS
|
FOSTER WHEELER NORTH AMERICA COPR.
|
SHANGHAI BOILER WORKS LTD.
|
2008-03-05
|
China
|
221800 Kgs
|
6 PKG
|
7
|
CPJQSN23SHAHOU15
|
6PACKAGES OF BOILER PARTS
|
FOSTER WHEELER NORTH AMERICAN CORP
|
SHANGHAI BOILER WORKS
|
2008-03-02
|
China
|
242840 Kgs
|
6 PKG
|
8
|
PCLW9003XSHH001
|
22 PKGS OF PRESSURE PARTS #13
|
FOSTER WHEELER NORTH AMERICA CORP.
|
SHANGHAI BOILER WORKS LTD
|
2008-02-01
|
China
|
639500 Kgs
|
22 PKG
|
9
|
RCKI223SHAHOU11
|
BOILER PARTS
|
FOSTER WHEELER NORTH AMERICA COPR.
|
SHANGHAI BOILER WORKS LTD.
|
2008-01-29
|
China
|
454320 Kgs
|
16 PKG
|
10
|
RCKI220SHAHOU11
|
BOILER PARTS HS 84029000 BOILER PARTS HS 84029000
|
FOSTER WHEELER NORTH AMERICA COPR.
|
SHANGHAI BOILER WORKS LTD.
|
2007-12-03
|
China
|
534480 Kgs
|
35 PKG
|