|
1
|
SIFKSMUM25000708
|
MANUFACTURING & SUPPLYING: MATERIAL & LABOR FOR FABRICATING HCM AS PER THE SPECS AND THE DRAWING MAIN SHELL:- MM THK SA GR. , JACKET SHELL:- MM THK SA GR. END PLATE:-IS GR. B + SA GR. CLADDING FLOW BAR: X MM THK SA GR. NOZZLES & DISCHARGE: SA GR. COUPLINGS:A MANUFAC, TURING & SUPPLYING OF CPPQ TANK AS PER THE SPECS PROVIDED BY CUSTOMER MAIN SHELL:- MM THK SA GR. JACKET SHELL & R.F.PADS FOR LEGS:- MM THK SA GR. DISHED ENDS
|
RELIANCE INDUSTRIES LIMITED
|
DEVCHAND ENGINEERS PRIVATE LIMITED
|
2025-08-29
|
India
|
3980 Kgs
|
2 PKG
|
|
2
|
SIFKSMUM136686
|
FM 020902 800 J JACKETED FM800 BOWL PRESSURE RATING60 WORKING,90PSI TESTING PRESSURE SS321 BOWL BOTTOM &CYLINDER WALL SS304 TOP RING A36 FLOW BARS &JACKETFULLY MACHINED AS PER DWGFM 020902 1000 J JACKETED FM1000 BOWL PRESSURE RATING 60WORKING, 90PSI TESTING PRESSURE SS321 BOWL BOTTOM &CYLINDER WALL SS304 TOP RING, A36 FLOW BARS &JACKET FULLY MACHINED AS PER DWGFM 020902 1200 J JACKETED FM1200 BOWL PRESSURE RATING 60WORKING, 90PSI TESTING PRESSURE SS321 BOWL BOTTOM &CYLINDER WALL SS304 TOP
|
RELIANCE INDUSTRIES LIMITED
|
DEVCHAND ENGINEERS PRIVATE LIMITED
|
2025-04-25
|
India
|
15600 Kgs
|
6 PKG
|
|
3
|
SIFKSMUM121177
|
1) FM1500L-2000L BASE FRAME FULL WELDMENT,DRILL TAP AS PER DWG1) WELDMENT & MACHINING OF 2000L BOWL(BOWL BOTTOM & CYLINDER)2) WELDMENT & MACHINING OF 2000L LID1) MATERIAL & LABOUR TO MACHINE SS304 7ROUND BAR AS PER 14550_SHAFTHCM8600 SHAFT14249_LQD_HPRLABOUR, MATERIAL, GASKET & HARDWARE TOFABRICATE LIQUID HOPPER, AND THE LID AS PERDWG 14249_LQD_HPRPTHALIATE HOPPERS (2)NON-PTHALIATE HOPPERS (2)
|
RELIANCE INDUSTRIES LIMITED
|
DEVCHAND ENGINEERS PRIVATE LIMITED
|
2024-05-08
|
India
|
8172 Kgs
|
6 PKG
|