1
|
BLOCK HANDLING EQUIPMENT:BLOCK APPROACH AND EVACUATION CONVEYOR SYSTEM(SR.NO.16)FOR FORGED WHEEL PLANT PROJECT,RAEBARELI
|
NTPC LIMITED
|
SURELAND INDUSTRIAL FIRE SAFETY LIMITED
|
2019-01-07
|
GERMANY
|
1.00 NOS
|
2
|
BLOCK HEATING EQUIPMENT:ROTARY RING HEARTH FURNACE(SR.NO.17)FOR FORGED WHEEL PLANT PROJECT,RAEBARELI
|
NTPC LIMITED
|
SURELAND INDUSTRIAL FIRE SAFETY LIMITED
|
2019-01-07
|
GERMANY
|
1.00 NOS
|
3
|
BLOCK HEATING EQUIPMENT:ROTARY RING HEARTH FURNACE(SR.NO.17)FOR FORGED WHEEL PLANT PROJECT,RAEBARELI
|
NTPC LIMITED
|
SURELAND INDUSTRIAL FIRE SAFETY LIMITED
|
2019-01-07
|
GERMANY
|
1.00 NOS
|
4
|
BLOCK HANDLING EQUIPMENT:BLOCK APPROACH AND EVACUATION CONVEYOR SYSTEM(SR.NO.16)FOR FORGED WHEEL PLANT PROJECT,RAEBARELI
|
NTPC LIMITED
|
SURELAND INDUSTRIAL FIRE SAFETY LIMITED
|
2019-01-07
|
GERMANY
|
6.00 NOS
|
5
|
5.2.3.8 & 5.2.3.9 OP 400 CHIP DISPOSAL & LIQUID COOLING SYST - EM
|
NTPC LIMITED
|
SURELAND INDUSTRIAL FIRE SAFETY LIMITED
|
2019-01-07
|
GERMANY
|
18.00 NOS
|
6
|
5.2.2.10.5 AUTOMATION MEASURING AND CONTROL SYSTEM
|
NTPC LIMITED
|
SURELAND INDUSTRIAL FIRE SAFETY LIMITED
|
2019-01-07
|
GERMANY
|
64.00 NOS
|
7
|
BLOCK HEATING EQUIPMENT:ROTARY RING HEARTH FURNACE(SR.NO.17)FOR FORGED WHEEL PLANT PROJECT,RAEBARELI
|
NTPC LIMITED
|
SURELAND INDUSTRIAL FIRE SAFETY LIMITED
|
2019-01-07
|
GERMANY
|
35.00 NOS
|
8
|
ELECTRICALLY OPERATED DI NEEDLE VALVE WITH GEARBOX & ACTUATOR 700MM DIA(FOR DRINKING WATER SUPPLY PROJECT)
|
NTPC LIMITED
|
SURELAND INDUSTRIAL FIRE SAFETY LIMITED
|
2019-01-07
|
GERMANY
|
6.00 NOS
|
9
|
WELDING WIRE - UNION S 1 CRMO 2 V DIA: 4.0MM (SFA-5.23-EG-4,0MMIN POP) (CERT.NO.12030(27)/23/2017/E-16318 DATED 08.01.20
|
NTPC LIMITED
|
SURELAND INDUSTRIAL FIRE SAFETY LIMITED
|
2019-01-07
|
GERMANY
|
49.00 NOS
|
10
|
5.2.2.9.4 HEATING SYSTEM
|
NTPC LIMITED
|
SURELAND INDUSTRIAL FIRE SAFETY LIMITED
|
2019-01-07
|
GERMANY
|
85.00 NOS
|