1
|
CHANNEL CLEANROOM WALL & CEILING SYSTEMS WITH ACCESSORIES (6 50- SQUARE METER)
|
INTEGRATED CLEANROOM TECHNOLOGIES PRIVATE LIMITED
|
CHANNEL SYSTEMS ASIA SDN BHD
|
2024-09-04
|
MALAYSIA
|
1.00 SET
|
2
|
CHANNEL CLEANROOM WALL & CEILING SYSTEMS WITH ACCESSORIES FO R MOCK-UP ROOM -SAMPLE
|
CGMP PROJECTS PRIVATE LIMITED
|
CHANNEL SYSTEMS ASIA SDN BHD
|
2024-06-14
|
MALAYSIA
|
3622.00 KGS
|
3
|
CHANNEL CLEANROOM WALL & CEILING SYSTEMS ACCESSORIES
|
INTEGRATED CLEANROOM TECHNOLOGIES PRIVATE LIMITED
|
CHANNEL SYSTEMS ASIA SDN BHD
|
2024-06-06
|
MALAYSIA
|
1.00 SET
|
4
|
CHANNEL CLEANROOM WALL & CEILING SYSTEMS W/ACCESSORIES (10 PKGS N.W. 7362 KGS)
|
AXENIC SYSTEMS
|
CHANNEL SYSTEMS ASIA SDN BHD
|
2023-02-03
|
MALAYSIA
|
7362.00 KGS
|
5
|
CHANNEL CLEANROOM WALL & CEILING SYSTEMS W/ACCESSORIES (12 P - KGS N.W. 7767 KGS) (DETAILS AS PER PACKING LIST)
|
AXENIC SYSTEMS
|
CHANNEL SYSTEMS ASIA SDN BHD
|
2018-04-23
|
MALAYSIA
|
7767.00 KGS
|
6
|
CHANNEL CLEANROOM WALL & CEILING SYSTEMS W/ACCESSORIES (12 P - KGS N.W. 7767 KGS) (DETAILS AS PER PACKING LIST)
|
AXENIC SYSTEMS
|
CHANNEL SYSTEMS ASIA SDN BHD
|
2018-04-23
|
MALAYSIA
|
7767.00 KGS
|
7
|
CHANNEL CLEAN ROOM WALL&CEILING SYSTEMS WITH ACCESSORIES
|
ASEPTIC PROJECTSS
|
CHANNEL SYSTEMS ASIA SDN BHD
|
2018-02-06
|
MALAYSIA
|
85.00 KGS
|
8
|
CHANNEL CLEAN ROOM WALL&CEILING SYSTEMS WITH ACCESSORIES
|
ASEPTIC PROJECTSS
|
CHANNEL SYSTEMS ASIA SDN BHD
|
2018-02-06
|
MALAYSIA
|
1000.00 KGS
|
9
|
CHANNEL CLEAN ROOM WALL&CEILING SYSTEMS WITH ACCESSORIES
|
ASEPTIC PROJECTSS
|
CHANNEL SYSTEMS ASIA SDN BHD
|
2018-02-06
|
MALAYSIA
|
85.00 KGS
|
10
|
CHANNEL CLEAN ROOM WALL&CEILING SYSTEMS WITH ACCESSORIES
|
ASEPTIC PROJECTSS
|
CHANNEL SYSTEMS ASIA SDN BHD
|
2018-02-06
|
MALAYSIA
|
1000.00 KGS
|