1
|
ASSY, T90 ANNULAR BOP, 13-5/8 5K, STUDDED BX-160 TOP ANDFLANGED BX-159 BOTTOM.W/1000 PSI (OILFIELD SUPPLIES)
|
FORESIGHT OFFSHORE DRILLING LIMITED S A
|
CAMERON FRANCE S.A.S
|
2023-06-26
|
FRANCE
|
1.00 NOS
|
2
|
ASSY BOP U-13-5/8 10K DOUBLE CAVITY, W/ API BX159 FLANGED TOP X FLANGEDBOTTOM, W/ FOUR OF SAME SIZE 3-1/16 (10K-15K) (O
|
FORESIGHT OFFSHORE DRILLING LIMITED S A
|
CAMERON FRANCE S.A.S
|
2023-06-26
|
FRANCE
|
1.00 NOS
|
3
|
ASSY BOP U 13-5/8 10K DOUBLE CAVITY, W/ API BX-159 FLANGEDTOP X FIANGEDBOTIOM, W/ FOUR OF SAME SIZE 3-1/16 (10K-15K) (
|
FORESIGHT OFFSHORE DRILLING LIMITED S A
|
CAMERON FRANCE S.A.S
|
2023-06-26
|
FRANCE
|
1.00 NOS
|
4
|
BOP STACK 7 1/16-5M WITH ACCESSORIES (BLOWOUT PRECENTER)
|
MEGHA ENGINEERING & INFRASTRUCTURES LIMITED
|
CAMERON FRANCE SAS
|
2022-09-16
|
FRANCE
|
1.00 NOS
|
5
|
BOP STACK 7 1/16-5M-WITH ACCESSORIES (BLOWOUT PRECENTER)
|
MEGHA ENGINEERING & INFRASTRUCTURES LIMITED
|
CAMERON FRANCE SAS
|
2022-09-16
|
FRANCE
|
1.00 NOS
|
6
|
BOP STACK 7 1/16-5M (BLOWOUT PRECENTER)
|
MEGHA ENGINEERING & INFRASTRUCTURES LIMITED
|
CAMERON FRANCE SAS
|
2022-09-16
|
FRANCE
|
1.00 NOS
|
7
|
BOP STACK 7 1/16-5M (BLOWOUT PRECENTER)
|
MEGHA ENGINEERING & INFRASTRUCTURES LIMITED
|
CAMERON FRANCE SAS
|
2022-09-16
|
FRANCE
|
1.00 NOS
|
8
|
BOP STACK 7 1/16-5M WITH ACCESSORIES (BLOWOUT PRECENTER)
|
MEGHA ENGINEERING & INFRASTRUCTURES LIMITED
|
CAMERON FRANCE SAS
|
2022-09-16
|
FRANCE
|
1.00 NOS
|
9
|
BOP STACK 7 1/16-5M-WITH ACCESSORIES (BLOWOUT PRECENTER)
|
MEGHA ENGINEERING & INFRASTRUCTURES LIMITED
|
CAMERON FRANCE SAS
|
2022-09-16
|
FRANCE
|
1.00 NOS
|
10
|
BOP STACK 7 1/16-5 M (BLOWOUT PRECENTER)
|
MEGHA ENGINEERING & INFRASTRUCTURES LIMITED
|
CAMERON FRANCE SAS
|
2022-09-16
|
FRANCE
|
1.00 NOS
|