1
|
HOT FINISHED CARBON STEEL SEAMLESS PIPE
|
S B ENGINEERING
|
LINYI CM IMPORT & EXPORT CO. LTD
|
2024-06-30
|
CHINA
|
27.74 MTS
|
2
|
HOT FINISH CARBON STEEL SEAMLESS PIPES. (OD BLOW 355.6MM)
|
S B ENGINEERING
|
LINYI CM IMPORT & EXPORT CO. LTD
|
2023-02-11
|
CHINA
|
56.44 MTS
|
3
|
HOT FINISH CARBON STEEL SEAMLESS PIPES.
|
S B ENGINEERING
|
LINYI CM IMPORT EXPORT CO. LTD
|
2022-09-20
|
CHINA
|
56.21 MTS
|
4
|
HOT FINISHED CARBON STEEL SEAMLESS PIPES
|
S B ENGINEERING
|
N/A
|
2022-01-18
|
CHINA
|
55000.00 KGS
|
5
|
HOT FINISHED CARBON STEEL SEAMLESS PIPES
|
S B ENGINEERING
|
N/A
|
2022-01-18
|
CHINA
|
55000.00 KGS
|
6
|
HOT FINISH CARBON STEEL SEAMLESS PIPES
|
S B ENGINEERING
|
LINYI CM IMPORT EXPORT CO. LTD
|
2020-05-23
|
CHINA
|
27.74 MTS
|
7
|
HOT FINISH CARBON STEEL SEAMLESS PIPES
|
S B ENGINEERING
|
LINYI CM IMPORT EXPORT CO. LTD
|
2020-05-23
|
CHINA
|
27.74 MTS
|
8
|
HOT FINISH CARBON STEEL SEAMLESS PIPES
|
S B ENGINEERING
|
LINYI CM IMPORT EXPORT CO. LTD
|
2019-12-28
|
CHINA
|
22.86 MTS
|
9
|
HOT FINISH CARBON STEEL SEAMLESS PIPES
|
S B ENGINEERING
|
LINYI CM IMPORT EXPORT CO. LTD
|
2019-12-28
|
CHINA
|
22.86 MTS
|
10
|
JF7909 CERAMIC BOND (CODE: LZW87858PS) (PREPARATION OF CERAMIC FRITS AND RAW MATERIALS)(AG 2C)
|
S B ENGINEERING
|
N/A
|
2014-10-24
|
GERMANY
|
500.00 KGS
|