1
|
HEAVY MELTING SCRAP OF IRON STEEL PSIC NO. ASIA22/MEM2305202216721 DT19/05/2022
|
RAJRANI STEEL CASTING PVT LTD
|
MULTI METALS LINK FZC
|
2022-05-27
|
UNITED ARAB EMIRATES
|
185.72 MTS
|
2
|
HEAVY MELTING SCRAP OF IRON STEEL PSIC NO. ASIA22/MEM1205202216614 DT11/05/2022
|
RAJRANI STEEL CASTING PVT LTD
|
MULTI METALS LINK FZC
|
2022-05-18
|
UNITED ARAB EMIRATES
|
187.46 MTS
|
3
|
HEAVY MELTING SCRAP OF IRON STEEL PSIC NO. ASIA22/MEM1005202216587 DT09/05/2022
|
RAJRANI STEEL CASTING PVT LTD
|
DIVINE GLOBAL LTD
|
2022-05-17
|
UNITED ARAB EMIRATES
|
176.04 MTS
|
4
|
HEAVY MELTING SCRAP OF IRON STEEL PSIC NO. ASIA22/MEM1005202216586 DT08/05/2022
|
RAJRANI STEEL CASTING PVT LTD
|
DIVINE GLOBAL LTD
|
2022-05-17
|
UNITED ARAB EMIRATES
|
177.17 MTS
|
5
|
CRYSTALLIZERS COPPER MOULD TUBE (100*100*801-R4000MM) DRAWING NO: 3301104000231
|
RAJRANI STEEL CASTING PVT. LTD.
|
LITHOBUILT CO., LTD
|
2019-12-13
|
CHINA
|
12.00 NOS
|
6
|
CRYSTALLIZERS COPPER MOULD TUBE (100*100*801-R4000MM) DRAWING NO: 3301104000231
|
RAJRANI STEEL CASTING PVT. LTD.
|
LITHOBUILT CO., LTD
|
2019-12-13
|
CHINA
|
12.00 NOS
|
7
|
HEAVY MELTING STEEL SCRAP(MPCB NO.BO/JD(APC)TB-3/UAN NO.47705/R/AMALG.CC-1070 DT:12.09.2019
|
RAJRANI STEEL CASTING PVT. LTD.
|
DIVINE GLOBAL LTD.
|
2019-10-15
|
UNITED ARAB EMIRATES
|
188330.00 KGS
|
8
|
HEAVY MELTING STEEL SCRAP(MPCB NO.BO/JD(APC)TB-3/UAN NO.47705/R/AMALG.CC-1070 DT:12.09.2019
|
RAJRANI STEEL CASTING PVT. LTD.
|
DIVINE GLOBAL LTD.
|
2019-10-15
|
UNITED ARAB EMIRATES
|
188330.00 KGS
|
9
|
HEAVY MELTING STEEL SCRAP(AUTO PARTS SCRAP)(PSIC NO ASIA19/RGM0110201912244 DT 29.09.2019, MPCB NO BO/JD(APC)TB- /UANNO
|
RAJRANI STEEL CASTING PVT. LTD.
|
DIVINE GLOBAL LTD.
|
2019-10-14
|
UNITED ARAB EMIRATES
|
192210.00 KGS
|
10
|
HEAVY MELTING STEEL SCRAP(AUTO PARTS SCRAP)(PSIC NO ASIA19/RGM0110201912244 DT 29.09.2019, MPCB NO BO/JD(APC)TB- /UANNO
|
RAJRANI STEEL CASTING PVT. LTD.
|
DIVINE GLOBAL LTD.
|
2019-10-14
|
UNITED ARAB EMIRATES
|
192210.00 KGS
|