1
|
SPARES FOR AIR PRE HEATER - PLUM PAD ( 6 NOS)
|
ENCOTEC ENERGY(INDIA) PRTIVATE LIMITED
|
TINDA INDUSTRIAL GROUP LIMITED
|
2017-04-22
|
CHINA
|
5.00 KGS
|
2
|
SPARES FOR AIR PRE HEATER -INPUT COUPLING ( 3 NOS.)
|
ENCOTEC ENERGY(INDIA) PRTIVATE LIMITED
|
TINDA INDUSTRIAL GROUP LIMITED
|
2017-04-22
|
CHINA
|
18.00 KGS
|
3
|
VALVES -PRESSURE ADJ VALVE (8 PCS)
|
ENCOTEC ENERGY(INDIA) PRTIVATE LIMITED
|
SHIJIAZHUANG AIWO TRADING CO LTD
|
2015-10-07
|
CHINA
|
10.00 KGS
|
4
|
VALVES - BACK VALVE NRV (4 PCS)
|
ENCOTEC ENERGY(INDIA) PRTIVATE LIMITED
|
SHIJIAZHUANG AIWO TRADING CO LTD
|
2015-10-07
|
CHINA
|
2.00 KGS
|
5
|
VALVES FILTER CHANGEOVER VALVE (2 PCS)
|
ENCOTEC ENERGY(INDIA) PRTIVATE LIMITED
|
SHIJIAZHUANG AIWO TRADING CO LTD
|
2015-10-07
|
CHINA
|
116.00 KGS
|
6
|
VALVES -THREE WAY BALL VALVE (2 PCS)
|
ENCOTEC ENERGY(INDIA) PRTIVATE LIMITED
|
SHIJIAZHUANG AIWO TRADING CO LTD
|
2015-10-07
|
CHINA
|
52.00 KGS
|
7
|
FILTER
|
ENCOTEC ENERGY(INDIA) PRTIVATE LIMITED
|
SHIJIAZHUANG AIWO TRADING CO LTD
|
2015-10-07
|
CHINA
|
2.00 SET
|
8
|
CONDENSER TUBE LEAKAGE DETECTION PUMP MODEL NO.HN21C-A2,HEAD 25M,FLOW 1.8 M3/H(AG 5)
|
ENCOTEC ENERGY(INDIA) PRTIVATE LIMITED
|
SHIJIAZHUANG AIWO TRADING
|
2015-08-10
|
CHINA
|
1.00 NOS
|
9
|
AUX RELAY DZ-31B,DZS-12B[233]
|
ENCOTEC ENERGY(INDIA) PRTIVATE LIMITED
|
TINDA INDUSTRIAL GROUP LIMITED
|
2015-01-16
|
CHINA
|
3.00 NOS
|
10
|
DC CONTRACTOR-CZ0-400/20
|
ENCOTEC ENERGY(INDIA) PRTIVATE LIMITED
|
TINDA INDUSTRIAL GROUP LIMITED
|
2015-01-16
|
CHINA
|
2.00 NOS
|