1
|
HR120 , Frame 9 , First Stage Shroud Including coating
|
CORRTECH ENERGY LIMITED
|
DIETER STOFFEL GMBH
|
2022-01-29
|
GERMANY
|
31.00 NOS
|
2
|
1ST STAGE NOZZLE (RINGS AND SEGMENTS) FRAME 5-(FOR RE-EXPORTAFTER REPAIRS)-AS PER INVOICE AND PACKING LIST
|
CORRTECH ENERGY LIMITED
|
DIETER STOFFEL GMB
|
2021-02-04
|
NETHERLANDS
|
1.00 SET
|
3
|
1ST STAGE HR120 SHROUND FRAME 9 GAS TURBINE-(FOR RE-EXPORT AFTER REPAIRS)-AS PER INVOICE AND PACKING LIST
|
CORRTECH ENERGY LIMITED
|
DIETER STOFFEL GMB
|
2021-02-04
|
NETHERLANDS
|
2.00 SET
|
4
|
RACK IGV FRAME 6-AS PER INVOICE PACKING LIST
|
CORRTECH ENERGY LIMITED
|
DIETER STOFFEL GMB
|
2021-02-04
|
NETHERLANDS
|
1.00 SET
|
5
|
USED ( SECOND HAND ) VERTICAL LATHE SC 43 CNC TYPE YOM : 197 7 WITH STD ACCESSORIES
|
CORRTECH ENERGY LIMITED
|
M/S. DIETER STOFFEL GMBH
|
2017-06-16
|
ROMANIA
|
1.00 SET
|
6
|
5009653 NON-MAGENTIC DRILL COLLAR-7 OD(OD 178MM,ID 71.4MM, T HREAD CONNECTION NC50,LENGTH 9.5M)(1 NOS)
|
CORRTECH ENERGY LIMITED
|
SYNERGY ENERGY SOLUTIONS PTE LTD
|
2017-04-15
|
CHINA
|
1560.00 KGS
|
7
|
MUD MOTOR- 172MM (LOBE 7/8 STAGE 6) #PART NO.:7LZX7.0L-6 #3/ 4"" OD #LOBE 7/8 #STAGE:6
|
CORRTECH ENERGY LIMITED
|
TIANJIN LILIN PETROLEUM MACHINERY C
|
2017-02-03
|
CHINA
|
1.00 SET
|
8
|
AIPU REPLACMENT RECYCLING SCREENS FOR KEMTRON 350 MCS(8 NOS)(SIZE 1250 X 715MM)KPT 28-210 API 140 MESH
|
CORRTECH ENERGY LIMITED
|
SYNERGY ENERGY SOLUTIONS PTE LTD
|
2017-01-27
|
CHINA
|
133.33 PCS
|
9
|
AIPU REPLACMENT RECYCLING SCREENS FOR KEMTRON 1000 MCS (SIZE1260 X 730MM)KPT 28-50 API 50 MESH
|
CORRTECH ENERGY LIMITED
|
SYNERGY ENERGY SOLUTIONS PTE LTD
|
2017-01-27
|
CHINA
|
50.00 KGS
|
10
|
AIPU REPLACMENT RECYCLING SCREENS FOR KEMTRON 1000 MCS (3 NOS)(SIZE 1260 X 730MM) KPT 28-84 API 60 MESH
|
CORRTECH ENERGY LIMITED
|
SYNERGY ENERGY SOLUTIONS PTE LTD
|
2017-01-27
|
CHINA
|
50.00 KGS
|