1
|
DOTDGSP00000235
|
BW900 BLADE ROOT WAGON TW900 BLADE TIP WAGON
|
GE POWER & WATER
|
N/A
|
2025-05-18
|
Mexico
|
12130 Kgs
|
4 PAL
|
2
|
DOTDPRG00002225
|
BRACKET, FRONT, BRACKET REAR FRAME,SUPORT BEAM,
|
GE POWER & WATER
|
N/A
|
2025-05-18
|
Germany
|
8495 Kgs
|
28 PAL
|
3
|
MZLYJHTH032042
|
TURBINE PARTS BLADE ROTOR STG 1 HS CODE: 84069000 INVOICE NO .AE.E.E.1422.24-25 DT:22.11.2 024 SHIPMENT ID:202005901 SB NO.8993838 DT:13-MAR-25 FREIGH T COLLECT
|
GE POWER & WATER
|
M.S AZAD ENGINEERING PVT LTD
|
2025-05-10
|
Oman
|
3548 Kgs
|
3 CTN
|
4
|
MZLYJHTH032017
|
TURBINE PARTS HS CODE:84069000 INVOICE NO. AE.E.E.1583.24-2 5 DT:19.12.2024 AE.E.E.1951.24 -25 DT:19.12.2024 AE.E.E.1952. 24-25 DT:11.02.2025 SHIPMENT I D: 202001033 SB NO.8966546 DT: 13-MAR-25 FREIGHT COLLECT
|
GE POWER & WATER
|
M.S AZAD ENGINEERING PVT LTD
|
2025-05-04
|
India
|
9776 Kgs
|
9 CTN
|
5
|
DOTDPRG00002051
|
ESCAPE HATCHTOP DEFLECTOR LEFTTOP DEFLECTOR RIGHT
|
GE POWER & WATER
|
UAB ABEPA
|
2025-03-18
|
Lithuania
|
7650 Kgs
|
21 PAL
|
6
|
MZLYJHTH031340
|
TURBINE PARTS HS CODE:84069000 INVOICE NO. AE.E.E.662.24-25 DT: 30.07.2024 SB NO.5119988 D T:25-OCT-24 SHIPMENT ID:201860 672 FREIGHT COLLECT
|
GE POWER & WATER
|
M.S AZAD ENGINEERING PVT LTD
|
2024-12-22
|
India
|
2254 Kgs
|
2 CTN
|
7
|
MZLY24SH10003589
|
FORGE-7HA03-R2
|
GE POWER & WATER
|
WUXI TURBINE BLADE CO., LTD.
|
2024-08-02
|
China
|
4731 Kgs
|
7 PKG
|
8
|
MZLYSGHH217421
|
BLADES
|
GE POWER & WATER
|
WUXI TURBINE BLADE CO., LTD.
|
2024-07-09
|
China
|
2965 Kgs
|
7 CTN
|
9
|
MZLYSGHH216493
|
BLADES
|
GE POWER & WATER
|
WUXI TURBINE BLADE CO., LTD.
|
2024-06-25
|
China
|
2214 Kgs
|
2 CTN
|
10
|
MZLYSGHH216494
|
BLADES
|
GE POWER & WATER
|
WUXI TURBINE BLADE CO., LTD.
|
2024-06-25
|
China
|
2197 Kgs
|
2 CTN
|