<div style="display:inline;"><img height="1" width="1" style="border-style:none;" alt="" src="//www.googleadservices.com/pagead/conversion/1038283176/?label=gXdMCOiuggIQqOOL7wM&amp;guid=ON&amp;script=0"/></div>

China Petroleum Engineering And

US Customs records for China Petroleum Engineering And in Reem Island Najmat. See their past imports and exports, including shipments from Stream-flo Edmonton, a supplier based in Canada.
Total Shipments
2
Trading Partners
1
Top Partner
STREAM FLO EDMONTON
Ports
1
Top Port
Vancouver, BC
Contact Info
  • China Petroleum Engineering And
    Construction Corporation For Adnoc Onshore 5th Floor, Wafra Square Building Al Reem Island Najmat, Al

China Petroleum Engineering And Records

Get a complete importer history
Updated: 2025-11-30

Total Shipments

2
Date range
Available to paid subscribers
  • 1M
  • 3M
  • 6M
  • 1Y
  • 3Y
  • All
2006-11-01 - 2025-12-01
Total shipments from 2006-11-01 to 2025-12-01
Date range
Available to paid subscribers
Precise data and chart data points are only available to paid subscribers
  • Importer Shipments

Top Trading Partners

Top Ports

Legend
  • Vancouver, BC
More data available to paid subscribers

Sample Shipment From China Petroleum Engineering And

Bill of Lading CMDUCAN0960671
Arrival Date: 2025-11-30
Container Number: TLLU4229250
×
Cargo #1
Description CRATES LOADED INTO ' DRY CONTAINER(S) STREAM FLO CROWN SAFETY SYSTEM PACKAGE MODEL SRA- - SO PART DELIVERY CERS KC HS-NO CMA CGM CAN P-AIP - -IC - FCL CARGO CY TO CY SERVICE CONTRACT NO. QBDPS CONSIGNEE CONTINUED: ABU DHABI, UNITED ARAB EMIRATES NOTIFY PARTY CONTINUED: ABU DHABI, UNITED ARAB EMIRATES TOTAL PKGS PK FREIGHT PREPAID
Keywords crates loaded HS-Code DATA UNAVAILABLE Piece Count 24
Length 480 Height 108
Width 96 Load Status Loaded
Seal E07071 Equipment Description CN
Type 40 Foot Dry Container, Opening at one or both end Type of Service Pier to Pier
Container Type 40 Foot Dry Container, Opening at one or both end Marks & Numbers PROJECT: EPCM FOR BAB AND BU HASA AIP5 OFF-PLOT FACILITIES PROJECT PROJECT NO: P30350 ADNOC-ONSHORE,AGREEMENT NO: 4700018834 PURCHASE ORDER NO P-AIP5-12-IC10-001 INSURANCE POLICY NUMBER : P/101/1/2,023/MDR/OPG/13091
More data available to paid subscribers

Related companies to China Petroleum Engineering And

STREAM-FLO EDMONTON
canada
Sparkline
< 10
Total Shipments