1
|
NYKS006057332
|
TRACK LAYING BUL/ANGLDZERS,NEW 10 PACKAGES = 10 CASES POWER RECEIVING & PUMP CONTROL PANEL,LIGHTING PANEL,POWER SUPPLY BOX FOR BELT CONVEYOR,BELT CONVEYOR FLANGED PIPE WITH LOOSE FLANGE, PIPE WITH BOSS,MAIN FRAME, UPSIDE GUIDER,DOWNSIDE GUIDER, GUIDER,SUB FRAME,BEAM,SET PIECE,BAFFLE PLATE,SEDIMENTATION BASIN INCLINED PLATE MAIN FRAME, LIFT TRAM,TENSION BOLT,SET COLLARS, SPACER BOLT,SPACER NUT,BOLT FOR SUB FRAME,NUT FOR SUB FRAME,BOLT FOR UPSIDE GUIDER&BAFFLE,NUT FOR UPSIDE GUIDER&BAFFLE,BOLT FOR UPSIDE &DOWNSIDE GUIDER,NUT FOR UPSIDE &DOWNSIDE GUIDER,BOLT FOR GUIDER,NUT FOR GUIDER,BOLT FOR BEAM TAPER WASHER FOR BEAM,BOLT FOR SET PIECE,NUT FOR SET PIECE,TAPER WASHER FOR SET PIECE,WASHER FOR SET PIECE,CHEMICAL ANCHOR BOLT,CHEMICAL ANCHOR NUT,CHEMICAL ANCHOR WASHER, HOLE IN ANCHOR BOLT,HOLE IN ANCHOR NUT - WASHER,BOLT FOR LIFT PARTS, NUT FOR LIFT PARTS,TURNBUCKLE, INCLINED PLATE,SET COLLARS,HEXAGON WRENCH,BUTTERFLY VALVE, TURBIDIMETER,FLANGE,PRESSU RE GAUGE,BACK-WASH WATER TANK LEVEL SWITCH,BACK-WASH WATER INTA
|
INSTITUTO DE FOMENTO MUNICIPAL
|
HITACHI PLANT TECHNOLOGIES, LTD
|
2007-07-21
|
Japan
|
11845 Kgs
|
11 PKG
|
3
|
NYKS006038197
|
PIPE FIT,FLNG,IRON/NONALY STL THE PROJECT OF REHABILITATION OF PLANTS OF TREATMENT OF DRINKING WATER IN THE INTERIOR (PHASE III) EL PROYECTO DE REHABILITACION DE PLANTAS DE TRATAMIENTO DE AGUA POTABLE EN EL INTERIOR (FASE III) ========================== ====== NUMERO DE VERIFICACION : 18-VGJ-86 CON FECHA 21 DE DICIEMBRE DE 2006 "SHIPPER-S DESIRE TO STATE THAT" PAIS DE ORIGEN : JAPON HTS CODE:730791/730630 PIPE ELBOW TEE SOFF FLANGE
|
INSTITUTO DE FOMENTO MUNICIPAL
|
HITACHI PLANT TECHNOLOGIES, LTD
|
2007-03-17
|
Japan
|
4390 Kgs
|
3 PKG
|